Lawn Care

Leveling the lazy way


https://imgur.com/a/gGXyNej

8 yards of top soil and 4 yards of masonry sand. 3 shovels dirt, 3 shovels sand, 3 shovels dirt. Repeat 1.5x. I made a train with the gorilla cart and drag mat. Once I got to where I wanted to level, I pulled the drag mat to the cart, dumped the cart and started pulling. The higher the speed the better the soil dispersed.

5 hours and I got halfway through. Not sure how I could optimize this process further except if I had a helper with shoveling.

I plan on applying prodiamine once I'm done today.

by lmidgitd

1 Comment

  1. idliketobeanon97

    I think doing it the lazy way is hiring it out. You’re just being smart

    Gonna look great when you’re done!

Write A Comment

Pin